SciELO - Scientific Electronic Library Online

 
vol.29 issue2Growth of Pinus arizonica Engelm. plants inoculated with Pisolithus tinctorius and Astraeus hygrometricus under greenhouse conditionsEffect of leaching time and seed position on the germination and vegetative characteristics of Moringa peregrina (Forssk.) Fiori author indexsubject indexsearch form
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

Related links

  • Have no similar articlesSimilars in SciELO

Share


Revista Chapingo serie ciencias forestales y del ambiente

On-line version ISSN 2007-4018Print version ISSN 2007-3828

Abstract

NAJERA-LUNA, Juan A.; MENDEZ-GONZALEZ, Jorge; CORRAL-RIVAS, Sacramento  and  HERNANDEZ, Francisco J.. Productivity of manual loading system of logs in El Salto, Durango, México. Rev. Chapingo ser. cienc. for. ambient [online]. 2023, vol.29, n.2, pp.119-131.  Epub Apr 05, 2024. ISSN 2007-4018.  https://doi.org/10.5154/r.rchscfa.2022.06.042.

Introduction:

In some forest regions of Mexico, it is common for short-sized logs to be hand-loaded; however, the efficiency of this operation has been poorly documented.

Objective:

To evaluate the effect of log size and distances on manual loading productivity in forests in the region of El Salto, Durango, Mexico.

Materials and methos:

A total of 738 manual loading cycles of 4 ft (1.22 m) logs were timed using the ‘back-to-zero’ method. Log volume and loading distances were taken by direct in-situ measurement. Average log diameters were divided into three categories and loading distances into four. The system yield was determined by relating log volume to total loading time.

Results and discussion:

Manual loading yield was established from 3.80 to 16.42 m3∙h-1, influenced by log diameter and loading distances, because 82 % of the loaded volume corresponds to logs with diameters from 10 to 30 cm, which are loaded every 12 s; logs larger than 30 cm require 27 s. Also, 91 % of the loading volume is carried out in the first 10 m of distance from the truck and takes 15 s per log, and, at longer distances, 35 s.

Conclusions:

It is possible to increase the performance of the operation by considering maximum loading distances in the order of 10 m.

Keywords : log diameter; loading distance; loading cycle; productivity; logs.

        · abstract in Spanish     · text in English | Spanish     · English ( pdf ) | Spanish ( pdf )