SciELO - Scientific Electronic Library Online

 
vol.13 issue3Reliability optimization of electrical distribution systems using internal loops to minimize energy not-supplied (ENS)A proposed method for design of test cases for economic analysis in power systems author indexsubject indexsearch form
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

Related links

  • Have no similar articlesSimilars in SciELO

Share


Journal of applied research and technology

On-line version ISSN 2448-6736Print version ISSN 1665-6423

Abstract

SHEN, C.-C.. Discussion on key successful factors of TPM in enterprises. J. appl. res. technol [online]. 2015, vol.13, n.3, pp.425-427. ISSN 2448-6736.

It generally takes 2.5 to 3 years for an enterprise to implement TPM in a full swing; however, the actual duration depends on each company's corporate status. Generally speaking, for a company with big staff, it even takes 3 to 5 years, but the major consideration should depend on whether the actual benefit is remarkable or not. This research aims to find out whether total productive maintenance (TPM) was carried out by enterprises, to inspect the enterprises' current performance, and to make comparison with those enterprises that have successfully carried out TPM. Through the findings, we hope to provide reference for enterprise owners when they carry out TPM, so as to reduce the cost for fumble.

Keywords : TPM; Total productive maintenance; Competitiveness.

        · text in English     · English ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License