<?xml version="1.0" encoding="ISO-8859-1"?><article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
<front>
<journal-meta>
<journal-id>1405-5546</journal-id>
<journal-title><![CDATA[Computación y Sistemas]]></journal-title>
<abbrev-journal-title><![CDATA[Comp. y Sist.]]></abbrev-journal-title>
<issn>1405-5546</issn>
<publisher>
<publisher-name><![CDATA[Instituto Politécnico Nacional, Centro de Investigación en Computación]]></publisher-name>
</publisher>
</journal-meta>
<article-meta>
<article-id>S1405-55462015000100003</article-id>
<article-id pub-id-type="doi">10.13053/CyS-19-1-1921</article-id>
<title-group>
<article-title xml:lang="en"><![CDATA[Finding Pure Nash Equilibrium for the Resource-Constrained Project Scheduling Problem]]></article-title>
</title-group>
<contrib-group>
<contrib contrib-type="author">
<name>
<surname><![CDATA[De Ita Luna]]></surname>
<given-names><![CDATA[Guillermo]]></given-names>
</name>
<xref ref-type="aff" rid="A01"/>
</contrib>
<contrib contrib-type="author">
<name>
<surname><![CDATA[Zacarias-Flores]]></surname>
<given-names><![CDATA[Fernando]]></given-names>
</name>
<xref ref-type="aff" rid="A01"/>
</contrib>
<contrib contrib-type="author">
<name>
<surname><![CDATA[Altamirano-Robles]]></surname>
<given-names><![CDATA[L. Carlos]]></given-names>
</name>
<xref ref-type="aff" rid="A01"/>
</contrib>
</contrib-group>
<aff id="A01">
<institution><![CDATA[,Benemérita Universidad Autónoma de Puebla Computer Science Department ]]></institution>
<addr-line><![CDATA[Puebla ]]></addr-line>
<country>México</country>
</aff>
<pub-date pub-type="pub">
<day>00</day>
<month>03</month>
<year>2015</year>
</pub-date>
<pub-date pub-type="epub">
<day>00</day>
<month>03</month>
<year>2015</year>
</pub-date>
<volume>19</volume>
<numero>1</numero>
<fpage>17</fpage>
<lpage>27</lpage>
<copyright-statement/>
<copyright-year/>
<self-uri xlink:href="http://www.scielo.org.mx/scielo.php?script=sci_arttext&amp;pid=S1405-55462015000100003&amp;lng=en&amp;nrm=iso"></self-uri><self-uri xlink:href="http://www.scielo.org.mx/scielo.php?script=sci_abstract&amp;pid=S1405-55462015000100003&amp;lng=en&amp;nrm=iso"></self-uri><self-uri xlink:href="http://www.scielo.org.mx/scielo.php?script=sci_pdf&amp;pid=S1405-55462015000100003&amp;lng=en&amp;nrm=iso"></self-uri><abstract abstract-type="short" xml:lang="en"><p><![CDATA[The paper focuses on solving the Resource-Constrained Project Scheduling (RCPS) problem with a method based on intelligent agents. Parallelism for performing the tasks is allowed. Common and limited resources are available to all agents. The agents are non-cooperative and compete with each other for the use of common resources, thereby forming instances of RCPS problem. We analyze the global joint interaction of scheduling via a congestion network and seek to arrive at stable assignments of scheduling. For this class of network, stable assignments of scheduling correspond to a pure Nash equilibrium, and we show that in this case there is a guarantee of obtaining a pure Nash equilibrium in polynomial time complexity. The pure Nash equilibrium point for this congestion network will be a local optimum in the neighborhood structure of the projects, where no project can improve its completion time without negatively affecting the completion time of the total system. In our case, each state of the neighborhood represents an instance of the RCPS problem, and for solving such problem, we apply a novel greedy heuristic. It has a polynomial time complexity and works similar to the well-knowing heuristic NEH.]]></p></abstract>
<kwd-group>
<kwd lng="en"><![CDATA[Intelligent agents]]></kwd>
<kwd lng="en"><![CDATA[congestion network]]></kwd>
<kwd lng="en"><![CDATA[pure Nash equilibrium]]></kwd>
<kwd lng="en"><![CDATA[RCPS problem]]></kwd>
<kwd lng="en"><![CDATA[multi-scheduling]]></kwd>
<kwd lng="en"><![CDATA[greedy heuristic NEH]]></kwd>
</kwd-group>
</article-meta>
</front><body><![CDATA[  	    <p align="left"><font face="verdana" size="4">Art&iacute;culos</font></p>  	    <p>&nbsp;</p>  	    <p align="center"><font face="verdana" size="4"><b>Finding Pure Nash Equilibrium for the Resource&#45;Constrained Project Scheduling Problem</b></font></p>  	    <p>&nbsp;</p>  	    <p align="center"><font face="verdana" size="2"><b>Guillermo De Ita Luna, Fernando Zacarias&#45;Flores and L. Carlos Altamirano&#45;Robles</b></font></p>  	    <p>&nbsp;</p>  	    <p align="justify"><font face="verdana" size="2"><i>Computer Science Department, Autonomous University of Puebla (BUAP),</i> <i>M&eacute;xico.</i> <a href="mailto:deita@cs.buap.mx">deita@cs.buap.mx</a>, <a href="mailto:altamirano@cs.buap.mx">altamirano@cs.buap.mx</a>, <a href="mailto:fzflores@yahoo.com.mx">fzflores@yahoo.com.mx</a></font></p>  	    <p align="justify"><font face="verdana" size="2"><i>Corresponding author is Fernando Zacarias&#45;Flores.</i></font></p>  	    <p>&nbsp;</p>  	    ]]></body>
<body><![CDATA[<p align="justify"><font face="verdana" size="2">Article received on 12/12/2013.    <br> 	Accepted on 27/11/2014.</font></p>  	    <p>&nbsp;</p>  	    <p align="justify"><font face="verdana" size="2"><b>Abstract</b></font></p>  	    <p align="justify"><font face="verdana" size="2">The paper focuses on solving the Resource&#45;Constrained Project Scheduling (RCPS) problem with a method based on intelligent agents. Parallelism for performing the tasks is allowed. Common and limited resources are available to all agents. The agents are non&#45;cooperative and compete with each other for the use of common resources, thereby forming instances of RCPS problem. We analyze the global joint interaction of scheduling via a congestion network and seek to arrive at stable assignments of scheduling. For this class of network, stable assignments of scheduling correspond to a pure Nash equilibrium, and we show that in this case there is a guarantee of obtaining a pure Nash equilibrium in polynomial time complexity. The pure Nash equilibrium point for this congestion network will be a local optimum in the neighborhood structure of the projects, where no project can improve its completion time without negatively affecting the completion time of the total system. In our case, each state of the neighborhood represents an instance of the RCPS problem, and for solving such problem, we apply a novel greedy heuristic. It has a polynomial time complexity and works similar to the well&#45;knowing heuristic NEH.</font></p>  	    <p align="justify"><font face="verdana" size="2"><b>Keywords:</b> Intelligent agents, congestion network, pure Nash equilibrium, RCPS problem, multi&#45;scheduling, greedy heuristic NEH.</font></p>  	    <p>&nbsp;</p>  	    <p align="justify"><font face="verdana" size="2"><a href="/pdf/cys/v19n1/v19n1a3.pdf" target="_blank">DESCARGAR ART&Iacute;CULO EN FORMATO PDF</a></font></p>  	    <p>&nbsp;</p>  	    <p align="justify"><font face="verdana" size="2"><b>References</b></font></p>  	    ]]></body>
<body><![CDATA[<!-- ref --><p align="justify"><font face="verdana" size="2"><b>1. Agnetis, A., Briand, C., Billaut, J., &amp; Sucha, P. (2014).</b> Nash equilibria for the multi&#45;agent project scheduling problem with controllable processing times problem. <i>Journal of Scheduling,</i> Vol. 1, pp. 125&#45;142.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071483&pid=S1405-5546201500010000300001&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>2. Artigues, C., Michelon, P., &amp; Reusser, S. (2003).</b> Insertion techniques for static and dynamic resource constrained project scheduling. <i>European journal of Operational Research,</i> Vol. 149, pp. 249&#45;267.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071485&pid=S1405-5546201500010000300002&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>3. Averbakh, I. (2010).</b> Nash equilibrium in competitive project scheduling. <i>European journal of Operation Research,</i> Vol. 205, pp. 552&#45;556.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071487&pid=S1405-5546201500010000300003&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>4. Baar, T., Brucker, P., &amp; Knust, S. (1998).</b> <i>Meta heuristics: Advances and Trends in local search paradigms for optimizatiion,</i> chapter Tabu search algorithms and lower bounds for the resource constrained project scheduling problem. Kluwer, pp. 118.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071489&pid=S1405-5546201500010000300004&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>5. Bautista, J. &amp; Pereira, J. (2002).</b> Ant colonies for the RCPS problem. <i>Lecture notes in computer science,</i> Springer.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071491&pid=S1405-5546201500010000300005&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    ]]></body>
<body><![CDATA[<!-- ref --><p align="justify"><font face="verdana" size="2"><b>6. Bouleimen, K. &amp; Lecocq, H. (1998).</b> <i>Technical report, service de robotique et automatisation,</i> chapter A new efficient simulated annealing algorithm for the resource constrained project scheduling problem. Universitde Lisge, pp. 1&#45;20.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071493&pid=S1405-5546201500010000300006&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>7. Davis, E. &amp; Patterson, J. (1975).</b> A comparison of heuristics and optimum solutions in resource constrained project scheduling. <i>Management Science,</i> Vol. 21, pp. 944&#45;955.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071495&pid=S1405-5546201500010000300007&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>8. Deckro, R., Winkofsky, E., Herbert, J., &amp; Gangon, R. (1991).</b> Decomposition approach to multi project scheduling. <i>European journal of Operation Research,</i> Vol. 51, pp. 110&#45;118.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071497&pid=S1405-5546201500010000300008&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>9. Drwal, M., W., R., Ganzha, M., &amp; Paprzycki, M. (2014).</b> Equilibria in concave non&#45;cooperative games and their applications in smart energy allocation. <i>Internet and Distributed Computing Systems,</i> <i>LNCS,</i> volume 8729, pp. 409&#45;421.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071499&pid=S1405-5546201500010000300009&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>10. Elsasser, R., Gairing, M., Lucking, T., Mavronicolas, M., &amp; Monien, B. (2005).</b> A simple graph theoric model for selfish restricted scheduling. <i>Lectures notes in computer science,</i> Springer.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071501&pid=S1405-5546201500010000300010&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    ]]></body>
<body><![CDATA[<!-- ref --><p align="justify"><font face="verdana" size="2"><b>11. Fabrikant, A., Papdimitriou, C., &amp; Talwar, K. (2004).</b> The complexity of pure Nash equilibria. <i>Proceedings 34th ACM Symposium on Theory of Computing, STOC04,</i> ACM.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071503&pid=S1405-5546201500010000300011&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>12. Garrido, A., M.A. Salido, Baber, F., &amp; Lopez, M. (2000).</b> Heuristic methods for solving job shop scheduling problems. <i>Proc. ECAI&#45;2000 Workshop on New Results in Planning, Scheduling and Design</i> <i>(PuK2000),</i> pp. 44&#45;49.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071505&pid=S1405-5546201500010000300012&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>13. Kim, S. &amp; Leachman, R. (1993).</b> Multi project scheduling with explicit lateness costs. <i>IIE Transactions,</i> Vol. 25, pp. 98&#45;108.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071507&pid=S1405-5546201500010000300013&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>14. Kolisch, R. (1996).</b> Serial and parallel resource constrained project scheduling methods resisited: Theory and computation. <i>European journal of Operation Research,</i> Vol. 90, pp. 320&#45;333.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071509&pid=S1405-5546201500010000300014&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>15. Kolisch, R. &amp; Hartmann, S. (1998).</b> <i>Handbook on recent advances in project shceduling,</i> chapter Heuristic algorithms for solving the resource constrained project scheduling problem: Classification and computational analysis. Kluwer, pp. 1&#45;20.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071511&pid=S1405-5546201500010000300015&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    ]]></body>
<body><![CDATA[<!-- ref --><p align="justify"><font face="verdana" size="2"><b>16. Liefooghe, A., Basseur, M., Jourdan, L., &amp; El&#45;Ghazali, T. (2007).</b> Combinatorial optimization of stochastic multi objective problems: and application to the flow&#45;shop scheduling problem. <i>Lecture notes in computer science,</i> Springer.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071513&pid=S1405-5546201500010000300016&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>17. Ma, Y., Gao, Y., &amp; Wang, L. (2009).</b> A pcu resource scheduling algorithm based on Nash equilibrium. <i>Proceedings of the future information networks,</i> FIN.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071515&pid=S1405-5546201500010000300017&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>18. Mittal, M. &amp; Kanda, A. (2009).</b> Scheduling of multiple projects with resource transfers. <i>International journal of mathematics in operational research,</i> Vol. 1, pp. 303&#45;325.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071517&pid=S1405-5546201500010000300018&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>19. Naphade, K., Wu, S., &amp; Storer, R. (1997).</b> Problem space search algorithms for resource constrained project scheduling. <i>Annals of operations research,</i> Vol. 70, pp. 307&#45;326.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071519&pid=S1405-5546201500010000300019&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>20. Nawaz, M., Enscore Jr., E., &amp; Ham, I. (1983).</b> A heuristic algorithm forthe m&#45;machine n&#45;job flowshop sequencing problem. <i>OMEGA International Journal of Management Science,</i> Vol. 11, pp. 91&#45;95.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071521&pid=S1405-5546201500010000300020&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    ]]></body>
<body><![CDATA[<!-- ref --><p align="justify"><font face="verdana" size="2"><b>21. Nguyen, K. T. (2009).</b> NP&#45;Hardness of pure Nash equilibrium in scheduling and connection games. <i>Lecture notes in computer sciences,</i> Springer.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071523&pid=S1405-5546201500010000300021&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>22. Orlin, J., Punnen, A., &amp; Schulz, A. (2004).</b> Approximate local search in combinatorial optimization. <i>Proceedings of SODA,</i> SODA.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071525&pid=S1405-5546201500010000300022&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>23. Patterson, J. (1984).</b> A comparasion of exact approaches for solving the multiple constrained re&#45;sourve project scheduling problem. <i>Management Science,</i> Vol. 30, pp. 854&#45;867.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071527&pid=S1405-5546201500010000300023&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>24. Pereyrol, F., Dupas, R., Alix, T., &amp; Bourrieres, J. (1996).</b> Serial and parallel resource constrained project scheduling methods resisited: Theory and computation. <i>European journal of Operation Research,</i> Vol. 90, pp. 320&#45;333.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071529&pid=S1405-5546201500010000300024&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>25. Ravetti, M., Nakamura, F., Meneses, C., Resende, M., Mateus, G., &amp; Pardatlos, P. (2006).</b> Hybrid heuristics for the permutation flow shop problem. <i>Technical report, AT &amp; T Labs.,</i> AT &amp; T Labs TD&#45;6V9MEV.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071531&pid=S1405-5546201500010000300025&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    ]]></body>
<body><![CDATA[<!-- ref --><p align="justify"><font face="verdana" size="2"><b>26. Simpson, W. &amp; Patterson, J. (1996).</b> A multiple tree search procedure for the resource constrained project scheduling problem. <i>European journal of Operation Research,</i> Vol. 89, pp. 525&#45;542.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071533&pid=S1405-5546201500010000300026&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>  	    <!-- ref --><p align="justify"><font face="verdana" size="2"><b>27. Venkataramana, M. &amp; Raghavan, N. (2010).</b> Ant colony based algorithms for scheduling parallel batch processors with incompatible job families. <i>International journal of mathematics in operational research,</i> Vol. 2, pp. 73&#45;98.    &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=2071535&pid=S1405-5546201500010000300027&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --></font></p>      ]]></body><back>
<ref-list>
<ref id="B1">
<label>1</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Agnetis]]></surname>
<given-names><![CDATA[A.]]></given-names>
</name>
<name>
<surname><![CDATA[Briand]]></surname>
<given-names><![CDATA[C.]]></given-names>
</name>
<name>
<surname><![CDATA[Billaut]]></surname>
<given-names><![CDATA[J.]]></given-names>
</name>
<name>
<surname><![CDATA[Sucha]]></surname>
<given-names><![CDATA[P.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Nash equilibria for the multi-agent project scheduling problem with controllable processing times problem]]></article-title>
<source><![CDATA[Journal of Scheduling]]></source>
<year>2014</year>
<volume>1</volume>
<page-range>125-142</page-range></nlm-citation>
</ref>
<ref id="B2">
<label>2</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Artigues]]></surname>
<given-names><![CDATA[C.]]></given-names>
</name>
<name>
<surname><![CDATA[Michelon]]></surname>
<given-names><![CDATA[P.]]></given-names>
</name>
<name>
<surname><![CDATA[Reusser]]></surname>
<given-names><![CDATA[S.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Insertion techniques for static and dynamic resource constrained project scheduling]]></article-title>
<source><![CDATA[European journal of Operational Research]]></source>
<year>2003</year>
<volume>149</volume>
<page-range>249-267</page-range></nlm-citation>
</ref>
<ref id="B3">
<label>3</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Averbakh]]></surname>
<given-names><![CDATA[I.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Nash equilibrium in competitive project scheduling]]></article-title>
<source><![CDATA[European journal of Operation Research]]></source>
<year>2010</year>
<volume>205</volume>
<page-range>552-556</page-range></nlm-citation>
</ref>
<ref id="B4">
<label>4</label><nlm-citation citation-type="book">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Baar]]></surname>
<given-names><![CDATA[T.]]></given-names>
</name>
<name>
<surname><![CDATA[Brucker]]></surname>
<given-names><![CDATA[P.]]></given-names>
</name>
<name>
<surname><![CDATA[Knust]]></surname>
<given-names><![CDATA[S.]]></given-names>
</name>
</person-group>
<source><![CDATA[Meta heuristics: Advances and Trends in local search paradigms for optimizatiion, chapter Tabu search algorithms and lower bounds for the resource constrained project scheduling problem]]></source>
<year>1998</year>
<page-range>118</page-range><publisher-name><![CDATA[Kluwer]]></publisher-name>
</nlm-citation>
</ref>
<ref id="B5">
<label>5</label><nlm-citation citation-type="book">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Bautista]]></surname>
<given-names><![CDATA[J.]]></given-names>
</name>
<name>
<surname><![CDATA[Pereira]]></surname>
<given-names><![CDATA[J.]]></given-names>
</name>
</person-group>
<source><![CDATA[Ant colonies for the RCPS problem]]></source>
<year>2002</year>
<publisher-name><![CDATA[Springer]]></publisher-name>
</nlm-citation>
</ref>
<ref id="B6">
<label>6</label><nlm-citation citation-type="book">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Bouleimen]]></surname>
<given-names><![CDATA[K.]]></given-names>
</name>
<name>
<surname><![CDATA[Lecocq]]></surname>
<given-names><![CDATA[H.]]></given-names>
</name>
</person-group>
<source><![CDATA[Technical report, service de robotique et automatisation, chapter A new efficient simulated annealing algorithm for the resource constrained project scheduling problem]]></source>
<year>1998</year>
<page-range>1-20</page-range><publisher-name><![CDATA[Universitde Lisge]]></publisher-name>
</nlm-citation>
</ref>
<ref id="B7">
<label>7</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Davis]]></surname>
<given-names><![CDATA[E.]]></given-names>
</name>
<name>
<surname><![CDATA[Patterson]]></surname>
<given-names><![CDATA[J.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[A comparison of heuristics and optimum solutions in resource constrained project scheduling]]></article-title>
<source><![CDATA[Management Science]]></source>
<year>1975</year>
<volume>21</volume>
<page-range>944-955</page-range></nlm-citation>
</ref>
<ref id="B8">
<label>8</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Deckro]]></surname>
<given-names><![CDATA[R.]]></given-names>
</name>
<name>
<surname><![CDATA[Winkofsky]]></surname>
<given-names><![CDATA[E.]]></given-names>
</name>
<name>
<surname><![CDATA[Herbert]]></surname>
<given-names><![CDATA[J.]]></given-names>
</name>
<name>
<surname><![CDATA[Gangon]]></surname>
<given-names><![CDATA[R.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Decomposition approach to multi project scheduling]]></article-title>
<source><![CDATA[European journal of Operation Research]]></source>
<year>1991</year>
<volume>51</volume>
<page-range>110-118</page-range></nlm-citation>
</ref>
<ref id="B9">
<label>9</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Drwal]]></surname>
<given-names><![CDATA[M.]]></given-names>
</name>
<name>
<surname><![CDATA[W.]]></surname>
<given-names><![CDATA[R.]]></given-names>
</name>
<name>
<surname><![CDATA[Ganzha]]></surname>
<given-names><![CDATA[M.]]></given-names>
</name>
<name>
<surname><![CDATA[Paprzycki]]></surname>
<given-names><![CDATA[M.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Equilibria in concave non-cooperative games and their applications in smart energy allocation]]></article-title>
<source><![CDATA[Internet and Distributed Computing Systems]]></source>
<year>2014</year>
<volume>8729</volume>
<page-range>409-421</page-range></nlm-citation>
</ref>
<ref id="B10">
<label>10</label><nlm-citation citation-type="book">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Elsasser]]></surname>
<given-names><![CDATA[R.]]></given-names>
</name>
<name>
<surname><![CDATA[Gairing]]></surname>
<given-names><![CDATA[M.]]></given-names>
</name>
<name>
<surname><![CDATA[Lucking]]></surname>
<given-names><![CDATA[T.]]></given-names>
</name>
<name>
<surname><![CDATA[Mavronicolas]]></surname>
<given-names><![CDATA[M.]]></given-names>
</name>
<name>
<surname><![CDATA[Monien]]></surname>
<given-names><![CDATA[B.]]></given-names>
</name>
</person-group>
<source><![CDATA[A simple graph theoric model for selfish restricted scheduling]]></source>
<year>2005</year>
<publisher-name><![CDATA[Springer]]></publisher-name>
</nlm-citation>
</ref>
<ref id="B11">
<label>11</label><nlm-citation citation-type="">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Fabrikant]]></surname>
<given-names><![CDATA[A.]]></given-names>
</name>
<name>
<surname><![CDATA[Papdimitriou]]></surname>
<given-names><![CDATA[C.]]></given-names>
</name>
<name>
<surname><![CDATA[Talwar]]></surname>
<given-names><![CDATA[K.]]></given-names>
</name>
</person-group>
<source><![CDATA[The complexity of pure Nash equilibria]]></source>
<year>2004</year>
</nlm-citation>
</ref>
<ref id="B12">
<label>12</label><nlm-citation citation-type="">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Garrido]]></surname>
<given-names><![CDATA[A.]]></given-names>
</name>
<name>
<surname><![CDATA[M.A. Salido, Baber]]></surname>
<given-names><![CDATA[F.]]></given-names>
</name>
<name>
<surname><![CDATA[Lopez]]></surname>
<given-names><![CDATA[M.]]></given-names>
</name>
</person-group>
<source><![CDATA[Heuristic methods for solving job shop scheduling problems]]></source>
<year>2000</year>
<page-range>44-49</page-range></nlm-citation>
</ref>
<ref id="B13">
<label>13</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Kim]]></surname>
<given-names><![CDATA[S.]]></given-names>
</name>
<name>
<surname><![CDATA[Leachman]]></surname>
<given-names><![CDATA[R.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Multi project scheduling with explicit lateness costs]]></article-title>
<source><![CDATA[IIE Transactions]]></source>
<year>1993</year>
<volume>25</volume>
<page-range>98-108</page-range></nlm-citation>
</ref>
<ref id="B14">
<label>14</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Kolisch]]></surname>
<given-names><![CDATA[R.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Serial and parallel resource constrained project scheduling methods resisited: Theory and computation]]></article-title>
<source><![CDATA[European journal of Operation Research]]></source>
<year>1996</year>
<volume>90</volume>
<page-range>320-333</page-range></nlm-citation>
</ref>
<ref id="B15">
<label>15</label><nlm-citation citation-type="book">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Kolisch]]></surname>
<given-names><![CDATA[R.]]></given-names>
</name>
<name>
<surname><![CDATA[Hartmann]]></surname>
<given-names><![CDATA[S.]]></given-names>
</name>
</person-group>
<source><![CDATA[Handbook on recent advances in project shceduling, chapter Heuristic algorithms for solving the resource constrained project scheduling problem: Classification and computational analysis]]></source>
<year>1998</year>
<page-range>1-20</page-range><publisher-name><![CDATA[Kluwer]]></publisher-name>
</nlm-citation>
</ref>
<ref id="B16">
<label>16</label><nlm-citation citation-type="book">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Liefooghe]]></surname>
<given-names><![CDATA[A.]]></given-names>
</name>
<name>
<surname><![CDATA[Basseur]]></surname>
<given-names><![CDATA[M.]]></given-names>
</name>
<name>
<surname><![CDATA[Jourdan]]></surname>
<given-names><![CDATA[L.]]></given-names>
</name>
<name>
<surname><![CDATA[El-Ghazali]]></surname>
<given-names><![CDATA[T.]]></given-names>
</name>
</person-group>
<source><![CDATA[Combinatorial optimization of stochastic multi objective problems: and application to the flow-shop scheduling problem]]></source>
<year>2007</year>
<publisher-name><![CDATA[Springer]]></publisher-name>
</nlm-citation>
</ref>
<ref id="B17">
<label>17</label><nlm-citation citation-type="">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Ma]]></surname>
<given-names><![CDATA[Y.]]></given-names>
</name>
<name>
<surname><![CDATA[Gao]]></surname>
<given-names><![CDATA[Y.]]></given-names>
</name>
<name>
<surname><![CDATA[Wang]]></surname>
<given-names><![CDATA[L.]]></given-names>
</name>
</person-group>
<source><![CDATA[A pcu resource scheduling algorithm based on Nash equilibrium]]></source>
<year>2009</year>
</nlm-citation>
</ref>
<ref id="B18">
<label>18</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Mittal]]></surname>
<given-names><![CDATA[M.]]></given-names>
</name>
<name>
<surname><![CDATA[Kanda]]></surname>
<given-names><![CDATA[A.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Scheduling of multiple projects with resource transfers]]></article-title>
<source><![CDATA[International journal of mathematics in operational research]]></source>
<year>2009</year>
<volume>1</volume>
<page-range>303-325</page-range></nlm-citation>
</ref>
<ref id="B19">
<label>19</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Naphade]]></surname>
<given-names><![CDATA[K.]]></given-names>
</name>
<name>
<surname><![CDATA[Wu]]></surname>
<given-names><![CDATA[S.]]></given-names>
</name>
<name>
<surname><![CDATA[Storer]]></surname>
<given-names><![CDATA[R.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Problem space search algorithms for resource constrained project scheduling]]></article-title>
<source><![CDATA[Annals of operations research]]></source>
<year>1997</year>
<volume>70</volume>
<page-range>307-326</page-range></nlm-citation>
</ref>
<ref id="B20">
<label>20</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Nawaz]]></surname>
<given-names><![CDATA[M.]]></given-names>
</name>
<name>
<surname><![CDATA[Enscore Jr.]]></surname>
<given-names><![CDATA[E.]]></given-names>
</name>
<name>
<surname><![CDATA[Ham]]></surname>
<given-names><![CDATA[I.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[A heuristic algorithm forthe m-machine n-job flowshop sequencing problem]]></article-title>
<source><![CDATA[OMEGA International Journal of Management Science]]></source>
<year>1983</year>
<volume>11</volume>
<page-range>91-95</page-range></nlm-citation>
</ref>
<ref id="B21">
<label>21</label><nlm-citation citation-type="book">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Nguyen]]></surname>
<given-names><![CDATA[K. T.]]></given-names>
</name>
</person-group>
<source><![CDATA[NP-Hardness of pure Nash equilibrium in scheduling and connection games]]></source>
<year>2009</year>
<publisher-name><![CDATA[Springer]]></publisher-name>
</nlm-citation>
</ref>
<ref id="B22">
<label>22</label><nlm-citation citation-type="book">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Orlin]]></surname>
<given-names><![CDATA[J.]]></given-names>
</name>
<name>
<surname><![CDATA[Punnen]]></surname>
<given-names><![CDATA[A.]]></given-names>
</name>
<name>
<surname><![CDATA[Schulz]]></surname>
<given-names><![CDATA[A.]]></given-names>
</name>
</person-group>
<source><![CDATA[Approximate local search in combinatorial optimization]]></source>
<year>2004</year>
<publisher-name><![CDATA[SODA]]></publisher-name>
</nlm-citation>
</ref>
<ref id="B23">
<label>23</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Patterson]]></surname>
<given-names><![CDATA[J.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[A comparasion of exact approaches for solving the multiple constrained re-sourve project scheduling problem]]></article-title>
<source><![CDATA[Management Science]]></source>
<year>1984</year>
<volume>30</volume>
<page-range>854-867</page-range></nlm-citation>
</ref>
<ref id="B24">
<label>24</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Pereyrol]]></surname>
<given-names><![CDATA[F.]]></given-names>
</name>
<name>
<surname><![CDATA[Dupas]]></surname>
<given-names><![CDATA[R.]]></given-names>
</name>
<name>
<surname><![CDATA[Alix]]></surname>
<given-names><![CDATA[T.]]></given-names>
</name>
<name>
<surname><![CDATA[Bourrieres]]></surname>
<given-names><![CDATA[J.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Serial and parallel resource constrained project scheduling methods resisited: Theory and computation]]></article-title>
<source><![CDATA[European journal of Operation Research]]></source>
<year>1996</year>
<volume>90</volume>
<page-range>320-333</page-range></nlm-citation>
</ref>
<ref id="B25">
<label>25</label><nlm-citation citation-type="book">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Ravetti]]></surname>
<given-names><![CDATA[M.]]></given-names>
</name>
<name>
<surname><![CDATA[Nakamura]]></surname>
<given-names><![CDATA[F.]]></given-names>
</name>
<name>
<surname><![CDATA[Meneses]]></surname>
<given-names><![CDATA[C.]]></given-names>
</name>
<name>
<surname><![CDATA[Resende]]></surname>
<given-names><![CDATA[M.]]></given-names>
</name>
<name>
<surname><![CDATA[Mateus]]></surname>
<given-names><![CDATA[G.]]></given-names>
</name>
<name>
<surname><![CDATA[Pardatlos]]></surname>
<given-names><![CDATA[P.]]></given-names>
</name>
</person-group>
<source><![CDATA[Hybrid heuristics for the permutation flow shop problem]]></source>
<year>2006</year>
<publisher-name><![CDATA[AT & T Labs.]]></publisher-name>
</nlm-citation>
</ref>
<ref id="B26">
<label>26</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Simpson]]></surname>
<given-names><![CDATA[W.]]></given-names>
</name>
<name>
<surname><![CDATA[Patterson]]></surname>
<given-names><![CDATA[J.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[A multiple tree search procedure for the resource constrained project scheduling problem]]></article-title>
<source><![CDATA[European journal of Operation Research]]></source>
<year>1996</year>
<volume>89</volume>
<page-range>525-542</page-range></nlm-citation>
</ref>
<ref id="B27">
<label>27</label><nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Venkataramana]]></surname>
<given-names><![CDATA[M.]]></given-names>
</name>
<name>
<surname><![CDATA[Raghavan]]></surname>
<given-names><![CDATA[N.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Ant colony based algorithms for scheduling parallel batch processors with incompatible job families]]></article-title>
<source><![CDATA[International journal of mathematics in operational research]]></source>
<year>2010</year>
<volume>2</volume>
<page-range>73-98</page-range></nlm-citation>
</ref>
</ref-list>
</back>
</article>
