SciELO - Scientific Electronic Library Online

 
vol.13 número3Reliability optimization of electrical distribution systems using internal loops to minimize energy not-supplied (ENS)A proposed method for design of test cases for economic analysis in power systems índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

Links relacionados

  • No hay artículos similaresSimilares en SciELO

Compartir


Journal of applied research and technology

versión On-line ISSN 2448-6736versión impresa ISSN 1665-6423

J. appl. res. technol vol.13 no.3 Ciudad de México jun. 2015

 

Articles

 

Discussion on key successful factors of TPM in enterprises

 

C.-C. Shen

 

Department of Product Development and Design, Taiwan Shoufu University, Tainan City, Taiwan. E-mail address: chi-chih@tsu.edu.tw

 

Abstract

It generally takes 2.5 to 3 years for an enterprise to implement TPM in a full swing; however, the actual duration depends on each company's corporate status. Generally speaking, for a company with big staff, it even takes 3 to 5 years, but the major consideration should depend on whether the actual benefit is remarkable or not. This research aims to find out whether total productive maintenance (TPM) was carried out by enterprises, to inspect the enterprises' current performance, and to make comparison with those enterprises that have successfully carried out TPM. Through the findings, we hope to provide reference for enterprise owners when they carry out TPM, so as to reduce the cost for fumble.

Keywords: TPM; Total productive maintenance; Competitiveness.

 

DESCARGAR ARTÍCULO EN FORMATO PDF

 

References

Chand, G., & Shirvani, B. (2000). Implementation of in cellular manufacture. Journal of Materials Processing Technology, 149-154.

Cua, K.O., Mclone, K.E., Roger, G., & Schroeder, A. (2001). Relationships between implementation of TQ, IT, and TPM and manufacturing performance. Journal of Operation Management, 675-694.

Katila, P. (2000). Applying total productive maintenance-TPM principles in the flexible manufacturing systems (p. 23). Technical Report. Lulea Tekniska University.         [ Links ]

Lixin, M., Shicheng, D., Yunqi, G., & Guiwen, Y. (2011). Study on application of TPM in small and medium-sized enterprises. In: 2011 International Conference on Management Science and Industrial Engineering (MSIE) (pp. 678-681). IEEE.         [ Links ]

McAdam, R., & Duffner, A.M. (1996). Implementation of total productive maintenance in support of an established total quality programme. Total Quality Management, 7, 613-630.         [ Links ]

Okogbaa, G., Huang, J., & Shell, R.L. (1992). Database design for predictive preventive maintenance system of automated manufacturing system. Computers and Industrial Engineering, 23, 7-10.         [ Links ]

Pintelonm, L., & Wassenhove, L.V. (1990). A Maintenance Management Tool. OMEGA, 18, 59-70.         [ Links ]

Rodrigues, M., & Hatakeyama, K. (2006). Analysis of the fall of TPM in companies. Materials Processing Technology, 276-279.         [ Links ]

Roup, J. (1999). Moving beyond TPM to total plant reliability: Redefining the concept to optimize benefits. Plant Engineering, 53, 32-5.         [ Links ]

Silver, E.A., & Fiechter, C.N. (1995). Preventive maintenance with limited historical data. European Journal of Operational Research, 82, 125-144.         [ Links ]

Wayne, P.J., Kennedy, W.J., & Fredendall, F.D. (1995). Total Productive Maintenance Is Not for This Company. Production and Inventory Management Journal, Second Quarter, 61-63.

Williamson (1997). Improve Organization Performance with Total Productive Maintenance. Plant Engineering, 46, 110-114.         [ Links ]

Windle, W.M. (1993). TPM: more alphabet soup or a useful plant improvement concept? Plant Engineering-Chicago, 47, 62-62.         [ Links ]

Wu, B., & Seddon, J.J. (1994). An anthropocentric approach to knowledge-based preventive maintenance. Journal of Intelligent Manufacturing, 5, 389-397.         [ Links ]

Yamashina, H. (2000). Challenge to world-class manufacturing. International Journal of Quality & Reliability Management, 17, 132-143.         [ Links ]

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons