SciELO - Scientific Electronic Library Online

 
vol.50 número197La síntesis estructural ética-aplicada del desarrollo internacionalLa energía renovable en Argentina como estrategia de política energética e industrial índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

Links relacionados

  • No hay artículos similaresSimilares en SciELO

Compartir


Problemas del desarrollo

versión impresa ISSN 0301-7036

Prob. Des vol.50 no.197 Ciudad de México abr./jun. 2019  Epub 18-Oct-2019

https://doi.org/10.22201/iiec.20078951e.2019.197.64669 

Articles

Evaluating Hydrocarbon Exploration and Extraction Contracts in Mexico, 2015-2017

Víctor Rodríguez Padillaa 

a National Autonomous University of Mexico (UNAM), Postgraduate Department of the Faculty of Engineering, Mexico. Email: energia123@hotmail.com.


Abstract

An estimation is made of the way oil revenue and production volume are distributed between the State and the contractor, in accordance with the provisions of the contracts awarded. First, contractual modalities, the tax system, and the bidding mechanism are described. Then, the physical and economic distribution of production is analyzed. It is concluded that the State receives an average of 72.4% of the revenue when the contractor is efficient, as opposed to 56.6% when the contractor is inefficient. The State receives no production from licensing and in shared production contracts with inefficient costs, the State recovers 30% of revenue.

Key Words: exploration contracts; production contracts; hydrocarbons; bidding rounds; oil revenue

Resumen

Se estima el reparto de la renta petrolera y el volumen de producción entre el Estado y el contratista, de acuerdo con lo establecido en los contratos adjudicados. Primero se describen las modalidades contractuales, el régimen fiscal y el mecanismo de licitación; luego se analiza el reparto físico y económico de la producción. Se concluye que el Estado recibe en promedio 72.4% de la renta cuando el contratista es eficiente, frente a un 56.5% cuando es ineficiente. En las licencias, el Estado no recibe producción alguna y, en los contratos de producción compartida recupera 30%, en un escenario de costos ineficientes.

Palabras clave: contratos de exploración; contratos de producción; hidrocarburos; rondas de licitaciones; renta petrolera

Clasificación JEL: D86; H57; L14; L71; L72

Date received: April 20, 2018.

Date accepted: October 15, 2018.

INTRODUCTION

Mexico freed up the exploration and extraction of hydrocarbons in December 2013, ending PEMEX’s exclusivity which lasted for 75 years.1 The Constitutional reform came with the government’s promise that the state will receive all the oil rents, and that the nation will retain ownership of the oil and gas in the subsoil (Presidencia de la República, n.d.). Another benefit of unique importance was the strengthening of the nation’s energy security with the entry of new operators to increase production.

The reform established a new organizational and regulatory model in the energy supply chains.2 In the field of upstream oil activities, the resources, reserves, and oilfields were divided into two: those that PEMEX would retain and those to be offered up to domestic and foreign investors through public international bids called Rondas del Estado (Rounds for the state).

In July 2015 and January 2018, eight calls for bids were carried out, four in round one and four in round two, in which 120 maritime and terrestrial areas were auctioned off. The maritime areas include shallow, deep, and ultra-deep-water areas in the Gulf of Mexico. From the total number offered, 15 shared production contracts were awarded along with 73 licensing contracts, for a total of 88 contracts (CNH, 2018).3

The main objective of this investigation consists of estimating the sale and volume of production which corresponds to the State according to the contracts. The process consisted of applying the contractual rules to an oil barrel in order to deduce the percentage of the sale and of the production which the State keeps. This approach can be explained by the fact that “the stance of the State in reaction to the participation of private capital in the exploration and production of oil should above all we a question of business, not ideology” (Boue, 2013). It is the business carried out by the state in its role as landowner “when it demands compensation for assets in the form of royalties, production rights and other encumbrances on oil and gas extraction in exchange for land exploitation of its hydrocarbon resources” (Boue, 2013).

For the sake of consistency, I adopted the definition of rent as used by the Mexican authorities, that is the difference between the sale price and the cost of production,4 which coincides with that used by the oil industry and by international organizations thanks to its easy estimation (Bolt et al., 2002, p. 8).5 However analyzing the accuracy of this definition in light of economic theory goes beyond the objectives of this investigation.6

This article is divided into three parts. In the first we describe the fiscal regime, the grounds for bids and the selection criteria. In the second section, we will present the results of round one and two. In the third we estimate the distribution of rent and production when the contractor is inefficient.

2. CONTRACTS, FISCAL REGIME AND BIDS

In accordance with the new legal framework, the nation shall assume responsibility for carrying out the activities of exploration and extraction of hydrocarbons with the aim of acquiring income for the state. These activities are considered strategic and exclusive, and are carried out via direct assignments to companies of the state or via contracts awarded to domestic and foreign companies which have been the subject of a competitive selection process. The Constitution leaves an opening making it possible for the authorities responsible for the sector to use any kind of contract and it explicitly mentions those related to licensing contracts, shared production or earnings contracts, and service con-tracts; the only thing not allowed is the use of concessions.

The ministries of energy and revenue establish technical and fiscal guidelines for the design of both contracts and the grounds for bids. The Ministry of energy decides the contractual areas to offer as well as the type of contract. The law mandates that said contract type maximize the nation’s income. Meanwhile, the Ministry of Revenue determines the variables for selection and the parameters under which the bidders must tender their bids. The National Hydrocarbon Commission (CNH)7 carries out the bidding process and signs the contract with those selected. There are technical, operative, and financial pre-selection stages to verify that the interested corporations have sufficient experience and skills for the jobs.

The fiscal regime for the contracts is established in the Ley de Ingresos sobre Hidrocarburos (Hydrocarbon Income Law). The encumbrances are referred to as “compensations in favor of the state” and are received by the Fondo Mexicano del Petróleo (Mexican Oil Fund). Table 1 illustrates the direct tax components. Payments made to the State in the licenses are the following: signing bonus; contractual quota for the exploratory stage; royalties; the “compensation”; tax on the activity of exploration and extraction of hydrocarbons, as well as income tax (ISR) 8 . The “compensation” or additional royalty is calculated as a percentage of the contractual value of the hydrocarbons as the companies proposed at the moment of bidding; the contract has provisions for an adjustments mechanism to let additional royalties increase and to halt increasing the profitability of the company in the case of extraordinary circumstances. The compensation in favor of the contractor is the onerous transmission of hydrocarbons extracted from the subsoil.9

Table 1 Hydrocarbon Value Distribution* 

Shared production contract
Contractual value of the hydrocarbons
Net Value Royalty
Operating Profits (OP) Recoverable Costs
Contract OP Company Adj. Mech. OP State
State´s compensation Company´s compensation
Royalty Adj. Mech. OP State OP Company Costo Recuperable
Value of hydrocarbons - production costs = rent 2/ productions costs
Take State´ Compensation ISR Net Profits
State Company
Licensing contract
Contractual Value of the hydrocarbons
Company compensation
Contract State´s compensation Company´s compensation
Royalty Adj. Mech. Additional royalty Company Profits Production costs
The Value of hidrocarbons - production costs = rent 2/ Costo de producción
Take State´s compensation ISR Net Profits
State Company

Notes: * the contractual quota for the exploratory stage and the tax on the activity of exploration and extraction of hydrocarbons are not incluyed due to their being of little significance. Oil distribution according to a scenario where the contractor is efficient and the recoverable costs coincided with production costs. The adjustment mechanism (Adj. Mech.), according to appendix 3 of the generic contract. Operational Profits (OP). Net profits = operational profits - ISR.

Source: created by the author.

In the shared production contracts, the compensation in favor of the State includes a contractual quota for the exploratory stage; royalties; and a percentage of operational profits (OP);10 tax on the activity of exploration and extraction of hydrocarbons as well as income tax (ISR). The compensation in favor of the contractor is the recovering of costs and the remaining OP. The compensations are paid in kind, that is by production; when these are in favor of the State the hydrocarbons are turned over to the State’s distributor which in turn hands over the products of its sale to the Mexican Oil Fund. The percent of the OP in favor of the State is subject to an adjustment mechanism to temper the profitability of the company when the price of oil or production rises significantly. The recovery of these costs is subject to a limit established by the Ministry of Revenue.11

Both for licenses and shared production contracts, the contractual quota for the exploratory stage is calculated based on the size of the contracted area and the time that has passed since the signing of the contract. The tax on exploration and extraction of hydrocarbons, which is also based on the square kilometers of the contracted area, differentiates between the stages of exploration and extraction.12 The royalties are determined for each type of hydrocarbon by applying the corresponding contractual value rate for each product.

The royalty for crude oil equals 7.5%, if the price is less than $48 US per barrel. If the price is greater the formula [(0.125 x contractual oil price) - 1.5]% is applied. The royalty for associated gas is equal to the contractual price of natural gas divided by 100. For non-associated natural gas, the royal-ty is 0 if the price is less than or equal to $5 US per million BTU (British Thermal Unit); or for a price between $5 and $5.5 US, they use the formula [(natural gas contractual price - 5) x 60.5]%. If the price is higher, the royalty is equal to the price divided by 100. For condensates, the royalty is 5% if the contractual price of the condensates is lower than $60 US per barrel and, for higher prices, they use the formula [(0.125 x contractual price) - 2.5]%.

The sum of the payments that the State receives, expressed as a percentage of the cash flow generated in an oilfield or a contracted area, is known in the oil industry as government take (Khelil, 1995) and is a better indicator of why a contract is appealing (Luo and Yan, 2010, p. 758). This concept, the State’s part in oil rent or simply the State’s part, does not form part of Mexican legislation, though the authorities use it in public statements and calculations. Included in the payments that the state receives is ISR as it is a fiscal resource in terms of cash flow and an accounting practice (Johnston, 1994, and Johnston et al., 2008).

The bidding process starts with a call for bids from the CNH, which includes the publishing of the rules for the bids, the contract type, prerequisites for qualification, geographical and geological characteristics of the areas being auctioned off, as well as a timeline of the process. Some days later the SHCP puts out an official communiqué indicating the minimum value of the selection variables for each area being bid upon, which in general are the supplementary investments, the additional royalty in the case of licenses and the OP for the state in shared production contracts. In recent bids, they have included a payment to act as a sort of tie breaker.

It is important to note that the legal framework neither defines nor uses the concept of oil rents. The term appears in government documents which define it as the difference between the in-come from the sale of hydrocarbons and the cost of extraction (Presidencia de la República, n.d.). This definition is generally used in interviews and statements, and above all in situations where high public functionaries assure that all oil rents will be received by the State (Excélsior, 2014; Jiménez-Espriú, 2013 and 2014). The press releases issued by the authorities in charge of bids also assert that the law, contracts, and selection criteria all guarantee that the State shall receive the oil rents (SHCP, 2015b,2015c, 2016, 2017a, 2017b and 2018).

3. ESTIMATES OF THE STATE’S SHARE OF INCOME

In Table 2 are the results of the first two rounds of bidding according to official statements. In round one the state’s share of income reached between 74% and 83% in the first call for bids, between 80% to 90% in the second, and 48% and 76% in the fourth. In the third call for bids, the authorities opted for publishing the state’s share of the gross income, which reached between 18% and 93%.13 The government’s expected or average share of profits in the second round reached 85.3% with a maximum of 88.3%;14 in the third call for bids the average was 63%; in the fourth the average reached 59.8% with a maximum of 66.1%. In round two the state’s share of profits was a little higher than during the first round.

Tabla 2 Official Results from Round 1 y 2. 

Bid Date Type Contracts
awarded
Range of the State´s
share of profits1,2
(%)
Expected States
of profits1,2
(%)
Expected
investment3
($MM US)
Guaranteed
investment4
($MM US)
R1.1. Shallow water exploration 15-jul-15 SPC 2 74 - 83 nd 2 870 151
R1.2. Shallow water extraction 30-sep-15 SPC 3 82 - 90 85.3 (máx 88.3) 3 248 600
R1.3. Land water extraction 15-dic-15 License 25 nd nd 1 044 623
R1.4. Deep wáter 05-dic-16 License 8 48 - 76 59.8 (máx 66.1) 34 353 344
R2.1. Shallow water exploration 19-jun-17 SPC 10 20 - 75 77.4 (máx 83.9) 8 193 309
R2.2. Land extraction 14-jul-17 License 7 41 - 86 1 100 169
R2.3. Land extraction 14-jul-17 License 14 42 - 98 75.0 (máx 82.0) 964 279
R2.4.Deep water 31-ene-18 License 19 53 - 74 64.7 (máx 67.2) 92 794 1 387
Round 1 and 2 5 83% licenses 88 20 - 98 72.4 (máx 77.5) 144566 3 862

Notes: 1 Includes royalties, contractual quotas for the exploratory stage, tax on hydrocarbon exploration and extraction and ISR; 2 In the R1.3 bids. The State´s share of gross income reaches 63% on average, 3 expected investment over the life of the contract assuming successful exploration, 4 minimum investment to which bidders have committed during the first years of the contract with performance bonds, 5 average estimate based on the official data for the eight calls for bids.

Source: created by the autor using data from the SHCP et al. (2015a, b, c, d; 2016a, b; 2018).

The concept of profits used by the authorities is not to be found in the hydrocarbon in-come law. Nevertheless, the breakdown of income, costs and compensations allows one to verify that said profit is equal to the difference between the value of hydrocarbons and the cost of production, in other words the oil rents as defined in documents and official statements. It is easy to prove with an example: in the case of round 1.1 where the winning bidder for blocks 2 and 7 offered 56% and 69% of OPS; the Mexican authorities conclude that the State’s share in said bid reaches between 74% and 86% for block 2 and between 83% and 80% for blocks 7 (SHCP et al., 2015a). Table 3 reproduces these results by applying the contractual and fiscal rules to a barrel of oil in a scenario where the prices are $50 per barrel and $100 per barrel; the method for the calculation includes the concepts of profit and government take used by the authorities; the calculations are consistent with the official results and allow us to conclude that profits and oil rents are synonymous.

Table 3 Sharing Out of an Oil Barrel According the Results of Round 1.1. Scenarios Prices of $50 US Dollars and $100 US Per Barrel (USD/bbl) 

Block 2 Block 7
Income (I) 50.0 100.0 50.0 100.0
Royalties (RY) 4.5 14.0 4.5 14.0
Efficient cost recovery (ECR) 20.0 20.0 20.0 20.0
Operating profits (OP) 25.5 66.0 25.5 66.0
Operating profit for the State (OPS) 14.3 37.0 17.6 45.5
Operating profit for the company (OPC) 11.2 15.8 7.9 13.2
Adjustment mechanism (AM) 0.0 13.2 0.0 7.3
Company´s gross income (CGI) 31.2 35.8 27.9 33.2
Company´s costs 20.0 20.0 20.0 20.0
Companies income before income tax (CI) 11.2 15.8 7.9 13.2
Income tax (ISR) 3.4 4.8 2.4 4.0
Company´s net income (CNI) 7.9 11.1 5.5 9.2
State´s income (SI) 22.1 68.9 24.5 70.8
Proyect´s profits (SP) 30.0 80.0 30.0 80.0
State ´s profits (SP) (%) 74.0 86.0 82.0 88.0
Company´s profits (Uco) (%) 26.0 14.0 18.0 12.0

Notes: I=oil price; RY= 9 % and 14% for a price of 50 and 100 US/bbl according to the Hydrocarbon Income Law; OP=income-royalty. OPS=56% of OP for Block 2 and 69 % of OP for Block 7 (as offered by the contractor); adjustment mechanism in accordance with appendix 3 of the contract, CGI= recovered cost plus operating profits; CI= gross income-costs; CNI=CI-ISR; SI= royalty + operating profits for the state + adjustment mechanism+ ISR; Profits=price-costs = oil rents; State´s profits = government take = State´s Income/Profits; Company´s profits=contractor take=Company´s gross income/Profits; The state´s income includes ISR (30%).

Source: Created by the autor in accordance with fiscal rules and the offers from the companies with winning bids.

In a recent press release on the benefits of the energy reform, the Presidency of the Mexi-can Republic pointed out that:

we opened the sector to participation from the private sector so that […] private capital […] can dedi-cate itself to the exploration and eventually the exploitation. Of the oil rents […] which will eventually be received when these explorations are successful, […] a good part will be for the Mexican State. The amount of the rent that the State will have is about 65% […] (Presidencia de la República, 2018, p. 1).15

Taking into consideration the official information of the state’s share of the income which came from the seven calls for bids, it turns out that the winning companies offered to leave the State an average 72.4% of the oil rents. The estimate is based on the offers made by the competing companies in order to be awarded the areas they are interested in. The actual payments for the concepts of compensation and taxes will occur many years later under different technical and economic conditions than those set forth in the bids. Even though there is a signed contract, it is not uncommon for the taxation system to change at the request of one or both parties in order to reflect actual production costs and the behavior of oil prices.

4. DISTRIBUTION OF RENT AND PRODUCTION WHEN THE CONTRAC-TOR IS INEFFICIENT

The official estimate for the distribution of profits assumes that the contractor is efficient and production costs are low. This raises the question “how would distribution change if the contractor is purposefully inefficient and turned to gold plating in order to keep for themselves the large bag of lucre that the government put on the table for the purpose of recovering costs? To illustrate the scenario, we use characteristics from Rounds 1.1 and 2.4 (see Table 4 which has results for the shared production contract in Round 1.1).

Table 4 Round 1.1. Shared Production Contract in Shallow Waters; Distribution of an Oil Barrel When the Contractor is Inefficient. Scenario price 50 USD/bbl with an inefficient cost of 30USD/bbl 

Price
(USD/bBl)
Royalty
(%)
Cost recovery
(%)
Operating
profit (%)
State´s operating
profit (%)
SHCP 50.0 7.8 60.0 32.2 12.9
Block 2 50.0 7.8 60.0 32.2 18.0
Block 7 50.0 7.8 60.0 32.2 22.2
ISR (USD/BBL) State= royalty+State´s
operating profit+ISR
(USD/bbl)
Rent = price- efficient
cost (USD/bbl)
State´s Rent
(%)
SHCP 2.9 23.6 30.0 44.1
Block 2 2.1 27.9 30.0 50.1
Block 7 1.5 31.5 30.0 55.0

Notes: 40% as base for OPS as defined by the SHCP. Winning bid of 55.99% in Block 2 and 68.99% in Block 7. Estimate arrived at under the following suppositions: 1) the royalty will be paid in kind; 2) contractual quota for the exploratory stage and the annual tax on the exploration and extraction are not significant; 3) the operating profit´s adjustment mechanism does not apply due to elevated costs and a low oil price; 6) efficient cost of 20 USD/bbl.

Source: Created by the author by applying fiscal rules and the winning bid offers.

The base established by the SHCP implies leaving the inefficient contractor with 55.9% of all rent and the state with 44.1%; the winning bids elevate the State’s share to 50 and 55%, which is be-low the 74% expected from an efficient operator; the conclusion is unavoidable: a contractor’s inefficiency has a high cost for the State.16

In the case of licenses in round 2.4, the contractor’s inefficiency impacts the adjustment mechanism for the royalty and the payment of ISR: the high costs make the first inoperable and leaves the ISR to be paid at zero. The base established by the SHCP implies sacrificing almost two thirds of the oil rent but the winning bids raise the take of State to 61.5% on average (see Table 5). Depending on the contract, the tax base for ISR becomes zero when the efficient production costs (40 USD/bbl in deep water) grow in a range which goes from 22% to 46% as a result of inefficiency and of gold plating.

Table 5 Round 2.4. Deep Water License Contract; Distribution of an Oil Barrel When the Contractor is Inefficient. Scenario Price and Production Cost of 70 and 40 USD/bbl. 

Area
number
Winning
Company
Additional
Royalty1
(%)
Base
Royalty
(%)
Total
Royalty
(%)
State´s
income2
(USD/bbl)
Oil rent
(USD/bbl)
State´s
rent3
(%)
SHCP proposed
State´s
rent (%)
2 Shell and PEMEX 15.0 10.3 25.3 17.7 30.0 58.9 35.6
3 Shell and Qatar PI 10.0 10.3 20.3 14.2 30.0 47.3 35.6
4 Shell and Qatar PI 10.0 10.3 20.3 14.2 30.0 47.3 35.6
5 PEMEX 6.2 10.3 16.5 11.5 30.0 38.5 35.6
6 Shell and Qatar PI 20.0 10.3 30.3 21.2 30.0 70.6 35.6
7 Shell and Qatar PI 20.0 10.3 30.3 21.2 30.0 70.6 35.6
10 Repsol, PC Carigali and Ophir 20.0 10.3 30.3 21.2 30.0 70.6 31.2
12 PC Carigali, Ophir y PTTEP 20.0 10.3 30.3 21.2 30.0 70.6 31.2
14 Repsol and PC Carigali 20.0 10.3 30.3 21.2 30.0 70.6 31.2
18 PEMEX 7.1 10.3 17.4 12.2 30.0 40.5 31.2
20 Shell 20.0 10.3 30.3 21.2 30.0 70.6 35.6
21 Shell 20.0 10.3 30.3 21.2 30.0 70.6 35.6
22 Chevron, PEMEX and INPEX 18.4 10.3 28.7 20.1 30.0 66.9 35.6
23 Shell 10.1 10.3 20.3 14.2 30.0 47.4 35.6
24 Eni and Qatar PI 9.5 10.3 19.8 13.8 30.0 46.2 35.6
25 PC Carigali México 20.0 10.3 30.2 21.2 30.0 70.5 35.6
26 PC Carigali México 20.0 10.3 30.3 21.2 30.0 70.6 35.6
28 Shell 20.0 10.3 30.3 21.2 30.0 70.6 35.6
29 Repsol, Carigali, Sierra... 20.0 10.3 30.3 21.2 30.0 70.6 35.6
Average 16.1 10.3 26.4 18.5 30.0 61.5 34.7

Notes: 1 Additional royalty proposed by the winning bid; 2 State´s Income = base royalty+additional royalty; 3 Rent= price cost, The adjustment mechanism is not applied to the additional royalty; The contractor´s inefficiency nullifies the payment of ISR (the tax base becomes 0 for a cost overrun between 22% and 46 %, depending on the contract); Efficient cost = 40 USD/bbl.

Source: created by the author by applying fiscal rules and the winning bid offers.

In the two examples chosen - a shared production contract in shallow waters and licenses in deep waters - the price and cost scenario establish an oil rent level of 30 USD/bbl. This trait shared by both examples allows one to observe, in quantitative terms, that a contractor’s inefficiency has a lesser impact on the State’s income in the case of licenses when compared to shared production contracts. It was a foreseeable result in said production contracts from the moment that the cost intervened twice in calculating the State’s income; whereas in the case of licensing it only affects the calculation of the ISR. The strict control of costs during the operation of contracts is crucial for the State to receive the expected benefits.17

Following the same procedure as in the two previous examples, we analyzed the eight calls for bids to have a complete picture of the real or simulated impact that the contractor’s inefficiency has.

The inefficient scenario is created by taking into account how the change in costs renders ineffective the adjustment mechanism for royalties and the payment of ISR on licenses ineffective on the one hand, and the adjustment mechanism for operating profits and the payment of ISR on shared production contracts on the other.

The numbers displayed in Table 6 show that the rent for the State lies in the range of 20% to 88%, with an average of 56.5%. This is far from the 72.4% expected from efficient contractors (see Table 2).

Table 6 Results from Round 1 and 2 When the Contractor is Inefficient. 

Area
awarded
km2
Prospective
resources
awarded
(MMbcoe)
Guaranteed
investment
at 50 USD/bbl
Guaranteed
investment at 100
USD/bbl
Rent for
the state1
(%)
Production Volume
for the State
(%)
Round 1
1.1. 2 660 244 126 196 43 - 65 26 - 38
1.2. 2 168 471 517 805 40 - 64 30 - 39
1.3. 3 777 1 882 170 264 > 58 0
1.4. 4 18 818 8 444 500 584 36-87 0
Round 2
2.1. 2 5 872 2 420 288 356 24 - 53 14 - 32
2.2. 2 2 917 435 169 208 20 - 88 0
2.3. 2 2 594 279 344 20 - 88 0
2.4. 4 44 178 2 798 1 291 1 689 41 - 77 0
Round 1 & 2 75 984 16 694 3 340 4 446 56.5 Lic=0; SPC=30

Notes: 1.In shared production contracts an inefficient contractor exhausts the limits of cost recovery (60% of the production´s contractual value); neither the adjustment mechanism nor ISR apply due to the high recoverable production costs (costs recognized for tax purposes). 2 Price of 50 USD/bbl minus the production cost of 20 USD/bbl = a rent of 30 USD/BBL. 3 For R1.3, the extraction of crude oil, a price of 50 USD/BBL minus a production cost of 12 USD/bbl=a rent of 38 USD/bbl. 4 For rounds auctioning off deep water (R1.4 and R2.4) a price of 70 USD/BBL minus a production cost of 40 USD/bbl = a rent of 30 USD/bbl. SPC=Shared Production Contract.

Source: created by the autor by applying fiscal regulations and the winning bid offers.

Thanks to the distribution of molecules (hydrocarbon production), the results are notoriously unfavorable for the State: it has access to 15 of 88 awarded contracts; in the case of licenses, all the production goes through the hands of contractors and in the case of shared production contracts they only receive on average 30% of the extracted hydrocarbons. The terms for physical distribution of oil and natural gas allow one to conclude that the first two rounds of oil contracts will contribute little to improving the country’s energy security, in addition to the fact that contractors are not legally, contractually, or fiscally obligated to channel a percentage of production through the domestic market.

5. CONCLUSIONS

This investigation proposed to evaluate the performance of 88 hydrocarbon exploration and ex-traction contracts awarded in the first two rounds of bids. The main focus was on the distribution of rent and production resulting from the terms offered by the Mexican authorities in the eight calls for bids. The new constitutional framework mandates that the state choose the type of contract and the types of compensations which will maximize the nation’s income in order to get the greatest benefit and development in the long run, which is what makes this investigation pertinent and relevant. At the end of this analysis we concluded that:

  1. Oil rents and profits are two words used by the Mexican authorities to refer to the same thing: the difference between the price of oil and the production costs. Mexico does not recover 100% of the oil rent, but rather a fraction which depends on the fiscal offering of each bidder. The results are consistent with the nature of the oil contracts whose main objective for an oil company is access to the natural resource and associated rents.

  2. In the eight calls for bids that were carried out by January 2018, the State’s take lay somewhere in the range from 20% to 98% with an average of 72.4%, including ISR. The final estimate supposes that the contractor will be efficient and will pay the totality of taxes which it promised to during the bidding process.

  3. When the contractor is inefficient and costs are fiscally recoverable, it distances itself from the minimum cost and the State’s average take decreases. Estimates place it on average as far as 56.5% in the eight calls for bids. When the costs increase, physical income shrinks as the adjustment mechanism for the fiscal burden is not applied. Income taxes are not paid as the majority of that which is extracted in shared production contracts is destined to recover the costs. For the State to receive the expected rent will require institutional strength experience and wisdom in order to rigorously and effectively control the contractor’s costs it is willing to recognize. Without these attributes, it is not possible to comply with the constitutional mandate of maximizing the nations income.

  4. The governmental preference for licenses has the advantage of providing certainty and immediacy to the tax collection as it is based on royalties. The disadvantage is that all production stays in the hands of the operator, with no obligation of supplying the domestic market. In the case of energy security, these shared production contracts are better as part of that which is extracted stays in the country; nevertheless, that which is received by the State in the three calls for bids barely reaches 30% of that extracted when the contractor is inefficient. The contracts in their current form contribute only marginally to the nation’s energy security.

REFERENCES

Acquatella, J., Altomonte, H., Arroyo, A. y Lardé, J. (2013), "Rentas de recursos naturales no renovables en América Latina y el Caribe: evolución y participación estatal, 1990-2010", Santiago, CEPAL, División de Recursos Naturales e Infraestructura, Serie Seminarios y Conferencias núm. 72. [ Links ]

Banco Mundial (2018), Datos. Recuperado de <https://datos.bancomundial.org/pais/mexico> [ Links ]

Bartra, A. (2013), "Renta petrolera, cómo se forma, quiénes la pagamos, quién la capitaliza", Alegatos, núm. 83, México, UAM-Azcapotzalco, enero. [ Links ]

Bolt, K., Matete, M. y Clemens, M. (2002), "Manual for calculating Adjusted Net savings, Environment Department", Washington, World Bank. Recuperado de <https://goo.gl/eDkT9x> [ Links ]

Boue, J.C. (2013), "Cuidado con la renta", Nexos, México, junio. Recuperado de <https://www.nexos.com.mx/?p=15331> [ Links ]

Comisión Nacional de Hidrocarburos (CNH) (2018), Rondas México. Recuperado de <https://rondasmexico.gob.mx/> [ Links ]

Excélsior (5 de junio de 2014), "Aumentará renta petrolera del Estado con leyes secundarias: SHCP". Recuperado de http://www.excelsior.com.mx/nacional/2014/06/05/963442. [ Links ]

Jiménez-Espriú, J. (22 de junio de 2014) "¿Nos lo firman ante notario?", La Jornada. Recuperado de <http://www.jornada.unam.mx/2014/06/22/opinion/013a1pol> [ Links ]

______ (29 de agosto de 2013), "Reunión con el secretario de Energía", La Jornada. Recuperado de <http://www.jornada.unam.mx/2013/08/29/opinion/024a1pol> [ Links ]

Johnston, D. (1994), International Petroleum Fiscal Systems and Production sharing Contracts, Tulsa, PennWell Books. [ Links ]

Johnston D., Johnston, D. y Rogers, T. (2008), International Petroleum Taxation, New Hampshire, Independent Petroleum Association of America. [ Links ]

Khelil, Ch. (1995), "Fiscal Systems for Oil", Private Sector, núm. 46, Washington, World Bank . [ Links ]

Luo, D. y Yan, N. (2010), "Assessment of Fiscal Terms of International Petroleum Contracts", Petroleum Exploration and Development, 37(6). doi <https://doi.org/10.1016/S1876-3804(11)60009-8> [ Links ]

Mommer, B. (2003), Petróleo global y Estado nacional, Caracas, Comala.com [ Links ]

Presidencia de la República (s/f), Mitos sobre la Reforma Energética. Recuperado de <http://www.presidencia.gob.mx/reformaenergetica/#!los-mitos> [ Links ]

______ (2018), El Gobierno de la República defiende la Reforma Energética de manera denodada, entregada y apasionada. Recuperado de <https://goo.gl/9eAS42 > [ Links ]

Secretaría de Hacienda y Crédito Público (SHCP) (2015a), Primera convocatoria de la Ronda 1: valores mínimos para las variables de adjudicación de los contratos de exploración y extracción de hidrocarburos. Recuperado de <https://rondasmexico.gob.mx/wp-content/uploads/2015/09/R01L01_ Comunicado_SHCP_20150609.pdf> [ Links ]

______ (2015b), La Secretaría de Hacienda y Crédito Público establece los valores mínimos para las variables de adjudicación aplicables a la segunda convocatoria de la Ronda 1. Recuperado de <https://rondasmexico.gob.mx/wp-content/uploads/2015/09/comunicado_109_2015.pdf> [ Links ]

______ (2015c), La Secretaría de Hacienda y Crédito Público establece los valores mínimos para las variables de adjudicación aplicables a la tercera convocatoria de la Ronda 1. Recuperado de <http://www.hacienda.gob.mx/ Biblioteca_noticias_home/comunicado_142_2015.pdf> [ Links ]

______ (2016), Palabras del Dr. Miguel Messmacher, en la presentación de la primera convocatoria de la Ronda 2. Recuperado de <https://www.gob.mx/shcp/es/articulos/palabras-del-subsecretario-de-ingresos-miguel-messmacher-en-la-presentacion-de-la-primera-convocatoria-de-la-ronda-2?idiom=es> [ Links ]

______ (2017a), Se establecen valores mínimos y máximos para las primeras tres convocatorias de la Ronda 2. Recuperado de <https://www.gob.mx/shcp/prensa/comunicado-no-089-se-establecen-valores-minimos-y-maximos-para-las-primeras-tres-convocatorias-de-la-ronda-2> [ Links ]

______ (2017b), Se establecen los valores mínimos y máximos para las variables de adjudicación de la cuarta convocatoria de la Ronda 2. Recuperado de <https://www.gob.mx/shcp/prensa/comunicado-no-237-se-establecen-los-valores-minimos-y-maximos-para-las-variables-de-adjudicacion-de-la-cuarta-convocatoria-de-la-ronda-2> [ Links ]

______ (2018), Se establecen los valores mínimos y máximos para la primera convocatoria de la Ronda 3. Recuperado de <https://www.gob.mx/shcp/ prensa/se-establecen-los-valores-minimos-y-maximos-para-la-primera-convocatoria-de-la-ronda-3> [ Links ]

Secretaría de Hacienda y Crédito Público (SHCP), Comisión Nacional de Hidrocarburos y Secretaría de Energía (2015a), Resultados de la licitación de contratos para la exploración y extracción de hidrocarburos correspondientes a la primera convocatoria de la ronda uno. Recuperado de <https://rondasmexico.gob.mx/wp-content/uploads/2015/09/R01L01_Boletin008_20150715.pdf> [ Links ]

______, Comisión Nacional de Hidrocarburos, Secretaría de Energía (2015b), Resultados de la licitación de contratos para la exploración y extracción de hidrocarburos correspondientes a la segunda convocatoria de la ronda uno. Recuperado de <https://rondasmexico.gob.mx/wp-content/uploads/ R01L02_Boletin008_20150930.pdf> [ Links ]

______, Comisión Nacional de Hidrocarburos, Secretaría de Energía (2015c), Resultados de la licitación de contratos para la exploración y extracción de hidrocarburos correspondientes a la tercera convocatoria de la ronda uno. Recuperado de <https://rondasmexico.gob.mx/wp-content/uploads/2015/12/ R01L03_Boletin008_201512151.pdf> [ Links ]

______, Comisión Nacional de Hidrocarburos, Secretaría de Energía (2015d), Resultados de la cuarta convocatoria de la ronda uno y de la primera convocatoria para asociaciones con PEMEX. Recuperado de <https://rondasmexico.gob.mx/wp-content/uploads/2015/11/Bolet%C3%ADn-de-Prensa-Conjunto-023.pdf> [ Links ]

______, Comisión Nacional de Hidrocarburos, Secretaría de Energía (2017a), Resultados de la primera convocatoria de la ronda dos. Recuperado de <https://rondasmexico.gob.mx/wp-content/uploads/2017/06/Comunicado-No.-017-Conjunto-CNH-SHCP-SENER-19-junio-2017.pdf> [ Links ]

______, Comisión Nacional de Hidrocarburos, Secretaría de Energía (2017b), Resultados de la segunda y tercera convocatorias de la ronda dos. Recuperado de <https://rondasmexico.gob.mx/wp-content/uploads/2017/07/Boleti%C4%97n-de-Prensa-conjunto-Resultados-Licitaciones-2.2-y-2.3-12-jul.pdf> [ Links ]

______, Comisión Nacional de Hidrocarburos, Secretaría de Energía (2018), Resultados de la cuarta convocatoria de la ronda dos. Recuperado de <https:// rondasmexico.gob.mx/wp-content/uploads/2018/01/Comunicado-No.-003-Conjunto-CNH-SHCP-SENER-31-enero-2018.pdf> [ Links ]

Vargas, R. y Morales, M. E. (2011), La renta petrolera y la construcción de regímenes propietales, el caso de PEMEX, México, Centro de Investigaciones sobre América del Norte, Universidad Nacional Autónoma de México. [ Links ]

1According to the oil regime theories of Mommer (2003), Mexico replaced the proprietorial hydrocarbon regime for a non propietorial one, or by bringing an end to the transition process which had begun in the 1990s (Vargas and Morales, 2011, pp. 53-56).

2The secondary legislation was issued in August 2014, in which the hydrocarbons law and the hydrocarbons income law stand out.

3According to the national hydrocarbons commission, in the middle of May 2018 there were three more bids corresponding to around three, with the total of 81 areas on offer. Nine of these are nonconventional resources whose exploration will be carried out via fracking.

4it would be more correct to talk about the price of production instead of the cost of production (Bartra, 2013, p. 119).

5Comparing the rent of oil and natural gas with the GDP, the World Bank (2018) face value of production at an international price minus the cost of production directly from the wellhead using unitary production costs estimated by country.

6For example, CEPAL (ECLAC) defines pure economic rent as the difference between the value of production at an international price and the production cost directly at the wellhead or the mine. This includes the opportunity cost of the capital invested in the extraction operation (Acquatella et al., 2013, p. 17).

7From the Spanish “Comisión Nacional de Hidrocarburos”.

8From the Spanish Impuesto Sobre la Renta (Tax on Profits).

9This means that the State transferred to the contractor all ownership rights on the product, as long as it finds itself up to date with its payments.

10The operating profits in shared production contracts are equal to the contractual value of hydrocarbons minus the royalties and recoverable costs.

11The law permits that the costs, expenses and investments which have not been paid in the corresponding period due in said period be transferred to subsequent periods.

12This tax incorporates the Fondo para Entidades Federativas y Municipios Productores de Hidrocarburos (Fund for Federal Entities and Municipal Producers of Hydrocarbons) under the rules of the Mexican Internal Revenue Service (SAT).

13Some companies which participated in round 1.3 did not show up to sign the contract, possibly because the fiscal burden was too high (up to 92% of the gross income) and did not allow them to cover the costs. Since then the SHCP has placed an upper limit on the bids.

14The maximum is reached when the adjustment mechanism is applied according to appendix 3 of the contract.

15Translated from the original Spanish.

16When the limit of cost recovery is reduced, it increases exposure to the risk of operational inefficiency.

17The question carries over whether the Mexican institutions are sufficiently prepared to carry out this task in the context of extreme information asymmetry, and if they have the strength to withstand pressure from both operators (who are almost always reluctant to share their accounts, justify expenses, or make their accounting transparent), and political powers inclined to fiscal evasion when it comes to foreign investments.

Received: April 20, 2018; Accepted: October 15, 2018

Creative Commons License Este es un artículo publicado en acceso abierto bajo una licencia Creative Commons