SciELO - Scientific Electronic Library Online

 
vol.29 número2Crecimiento de plantas de Pinus arizonica Engelm. inoculadas con Pisolithus tinctorius y Astraeus hygrometricus en invernaderoEfecto del tiempo de lixiviación y posición de las semillas en la germinación y características vegetativas de Moringa peregrina (Forssk.) Fiori índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

Links relacionados

  • No hay artículos similaresSimilares en SciELO

Compartir


Revista Chapingo serie ciencias forestales y del ambiente

versión On-line ISSN 2007-4018versión impresa ISSN 2007-3828

Resumen

NAJERA-LUNA, Juan A.; MENDEZ-GONZALEZ, Jorge; CORRAL-RIVAS, Sacramento  y  HERNANDEZ, Francisco J.. Productivity of manual loading system of logs in El Salto, Durango, México. Rev. Chapingo ser. cienc. for. ambient [online]. 2023, vol.29, n.2, pp.119-131.  Epub 05-Abr-2024. ISSN 2007-4018.  https://doi.org/10.5154/r.rchscfa.2022.06.042.

Introduction:

In some forest regions of Mexico, it is common for short-sized logs to be hand-loaded; however, the efficiency of this operation has been poorly documented.

Objective:

To evaluate the effect of log size and distances on manual loading productivity in forests in the region of El Salto, Durango, Mexico.

Materials and methos:

A total of 738 manual loading cycles of 4 ft (1.22 m) logs were timed using the ‘back-to-zero’ method. Log volume and loading distances were taken by direct in-situ measurement. Average log diameters were divided into three categories and loading distances into four. The system yield was determined by relating log volume to total loading time.

Results and discussion:

Manual loading yield was established from 3.80 to 16.42 m3∙h-1, influenced by log diameter and loading distances, because 82 % of the loaded volume corresponds to logs with diameters from 10 to 30 cm, which are loaded every 12 s; logs larger than 30 cm require 27 s. Also, 91 % of the loading volume is carried out in the first 10 m of distance from the truck and takes 15 s per log, and, at longer distances, 35 s.

Conclusions:

It is possible to increase the performance of the operation by considering maximum loading distances in the order of 10 m.

Palabras llave : log diameter; loading distance; loading cycle; productivity; logs.

        · resumen en Español     · texto en Español | Inglés     · Español ( pdf ) | Inglés ( pdf )