SciELO - Scientific Electronic Library Online

 
vol.17 número3Density distribution effect on the analysis of the 6Li+ 58Ni reactionDevolatilization of a particle coal in a plasma reactor índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

Links relacionados

  • No hay artículos similaresSimilares en SciELO

Compartir


Journal of applied research and technology

versión On-line ISSN 2448-6736versión impresa ISSN 1665-6423

Resumen

ORTIZ-SERVIN, Juan José; CASTILLO, Alejandro  y  TALAVERA, Francisco. A new methodology to optimize operation cycles in a BWR using heuristic techniques. J. appl. res. technol [online]. 2019, vol.17, n.3, pp.155-162.  Epub 16-Abr-2020. ISSN 2448-6736.

A new system to optimize fuel assembly design, fuel reload design and control rod patterns design is shown. Fuel assembly optimization is made in two steps. In the first one, a recurrent neural network for the fuel lattice design of the bottom of the fuel assembly is used. In the second one, the top of the fuel assembly is built adding gadolinia to bottom fuel lattice. Fuel reload is optimized by another recurrent neural network whereas the control rod patterns are optimized by an ant colony method. This new system starts building a fresh fuel batch. Later, a seed fuel reload is optimized according to a Haling calculation. Afterwards an iterative process is started: firstly, control rod patterns through the cycle are optimized, once that a new fuel reload with previously optimized control rod patterns is found. If thermal limits cannot be satisfied in this iterative process after several iterations, a new seed fuel reload is designed. If cold shutdown margin cannot be fulfilled, then gadolonia concentration is increased into the fuel assembly. Finally, if energy requirements cannot be fulfilled, then the uranium enrichment of the fuel lattice of the bottom fuel assembly is increased. Results of this new system are successful: thermal limits and cold shutdown margin are fulfilled, and energy requirements are reached.

Palabras llave : BWR; heuristic techniques; optimization.

        · texto en Inglés     · Inglés ( pdf )