SciELO - Scientific Electronic Library Online

 
vol.21 número1La segunda es la vencida: El caso del royalty de 2004 y del impuesto específico a la gran minería de 2005 en ChileParticipación y rendimiento de la iniciativa privada en la gestión integral de los residuos sólidos urbanos en la frontera México-Estados Unidos índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

Links relacionados

  • No hay artículos similaresSimilares en SciELO

Compartir


Gestión y política pública

versión impresa ISSN 1405-1079

Resumen

DE ASSIS, Luis Otávio Milagres  y  NETO, Mário Teixeira Reis. Main Characteristics of the Performance-Related Pay System in Minas Gerais State Government: The Results Agreement and the Productivity Prize. Gest. polít. pública [online]. 2012, vol.21, n.1, pp.185-214. ISSN 1405-1079.

The implementation of performance-related pay systems is an important strategy related to the improvement of the public sector based on international experiences. However, its dissemination in Brazil is inceptive. The experience of Minas Gerais state government is a reference, since it is now running the major performance-related pay program in public administration in the country. In Minas Gerais state, each organization signed a Results Agreement (performance contract based on performance indicators). A Productivity Prize was implemented, along with the evaluation of those contracts, reaching all servants since 2008. This article describes and analyses the characteristics of the performance-related pay system implemented in Minas Gerais state in comparison to international experiences. Related literature is reviewed, focusing on trends and lessons learned worldwide, drawing a parallel to the case studied. The relation between this pay system and other reform strategies applied in Minas Gerais state is also analyzed. The conclusion is that the system studied is similar to international practices. A dilemma that this experience is facing is the risk of a comprehensive implementation, which may be an incentive to opportunist behavior related to a conservative goal-setting, turning the Productive Prize into a mere additional salary.

Palabras llave : results agreement; performance contracting; performance-related pay; productivity prize.

        · resumen en Español     · texto en Español     · Español ( pdf )

 

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons