SciELO - Scientific Electronic Library Online

 
vol.40 número1Prototipo de Silla de Ruedas Dirigida Usando ParpadeosABPSE: Alineador de ADN Basado en Paralelismo a Nivel de Bit y la Estrategia Siembra y Extiende índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

Links relacionados

  • Não possue artigos similaresSimilares em SciELO

Compartilhar


Revista mexicana de ingeniería biomédica

versão On-line ISSN 2395-9126versão impressa ISSN 0188-9532

Resumo

ARREGUI, M. et al. Risk Reduction in Electrical Networks and Safety of Biomedical Equipment in Clinical Settings. Rev. mex. ing. bioméd [online]. 2019, vol.40, n.1, e201822. ISSN 2395-9126.  https://doi.org/10.17488/rmib.40.1.3.

112 field inspections to 78 high technology medical centers (IMAE is the Spanish acronym) over 14 years are analyzed. All visits were evaluated as to Clinical Engineering good practices and were assigned a risk level. All audits included a questionaire to maintenance management personnel on electrical network operation as well as on biomedical equipment follow-up and documentation from acquisition to disposal. Risk is assigned a level 0 to 4 at each visit. In 2004-2007, 74% of IMAEs had safety problems in one or more of electrical network, maintenance management or documentation, and 15% of the IMAEs with safety problems had one piece of equipment described as simply “dangerous”. Electrical safety problems were eventually reduced to 0% in 2016-2017, probably as a consequence of regular audit and counseling by this University Clinical Engineering Program.

Palavras-chave : Risk Evaluation; Biomedical Equipment; Electrical Network; Clinical Engineering; Maintenance.

        · resumo em Espanhol     · texto em Espanhol     · Espanhol ( pdf )